Maximising value from construction and demolition waste materials

Aerial view of Sheehans C & D recycling plant

Source: CDE

Aerial view of Sheehans C & D recycling plant
Source: CDE
CDE launches their latest video case study demonstrating how construction, demolition and excavation waste can be re-used in high value construction applications. Filmed in conjunction with The Sheehan Group, a family-run business, specialising in construction and civil engineering, viewers have the opportunity to watch the full process from the removal of waste materials from a construction site, recycling the waste materials by wet processing and to their reuse in a residential construction project.  
The Sheehan Group, who are based in Oxford, recognised the need to optimise the reuse of waste materials and the business opportunities in this area. In 2012 they invested in an advanced construction and demolition waste recycling system from CDE. The facility uses the latest wet processing methods to create a range of certified sand and aggregates, which are being used in concrete products for the construction industry. The company are also able to use the filter cake material to engineer landfill cells and cap landfill sites. The plant includes a feed system, AggMax portable logwasher, Infinity screens and Evowash sand washing plant. In addition, the system employs full closed-circuit water recycling with the inclusion of the Aquacycle thickener and Filter Press
Source: CDE
The plant includes a feed system, AggMax portable logwasher, Infinity screens and Evowash sand washing plant. In addition, the system employs full closed-circuit water recycling with the inclusion of the Aquacycle thickener and Filter Press
Source: CDE
 
Tara Sheehan, Financial Director, Sheehan Group comments, “We received regular requests for alternative sustainable products, this facility enabled us to fulfil these requests.” The bespoke recycling plant contains a range of equipment which comes together to create an innovative wet processing solution. The plant includes a feed system, AggMax portable logwasher, Infinity screens and Evowash sand washing plant. In addition, the system employs full closed-circuit water recycling with the inclusion of the Aquacycle thickener and Filter Press.  
Eunan Kelly, CDE Reco Business Development Manager for Europe comments, “CDE Reco are continuously exploring innovative ways to increase diversion from landfill by exploring higher value opportunities for recovered CD&EW materials. We work in close collaboration with each customer to develop a tailored solution to maximise the volume of material that they can return into the construction market.”
 
Last year The Sheehan Group company celebrated reaching the milestone of diverting over 500 000 t of waste from UK landfill sites using the CDE recycling plant. Chris Sheehan, Managing Director, The Sheehan Group, comments, “The CDE installation has allowed us to take better control of our business and integrate our recycled products into construction projects. For example, we now make concrete blocks and ready-mixed concrete using recycled sand and aggregates which were formerly waste materials.”

 
www.cdeglobal.com


Related articles:

Issue 03/2020 Additional revenue

Processing of construction and demolition material with new plant from CDE

P?élichet Albert SA, the public works contractor and aggregates producer based in western France, operates a circular economy business model with operations in demolition, groundworks, landfill and...

more
Issue 07-08/2018

Symposium on circular economy

From September 18?–?19, 2018 a symposium entitled “Circular Driven Economy” will be held by the AF Groups, SINTEF, CDE and SHEEHAN in the Radisson Blu Edwardian Hotel in Heathrow. The EU...

more

16.01.2013 / Prime Minister lends support to C&D waste recycling investment

David Cameron visited a construction and demolition waste recycling plant in Oxford on Friday 4th January to see the latest recycling technology in action. David Cameron’s visit preceded the...

more
Issue 09/2016

New CDE washing plant for construction & demolition waste recycling in Norway

Recently Velde Pukk and CDE held a three-day demonstration event at Sandnes near Stavanger/Norway, to present the new wet processing plant with a capacity of 300 t/h for construction and demolition...

more
Issue 10/2020 Sand depletion

The global sand crisis not being talked about

T?here are events and seminal moments that propel an issue into the public consciousness. Consider rousing addresses by the likes of Sir David Attenborough and activist Greta Thunberg and their...

more