14.05.2013 / FLSmidth to supply large material handling system

FLSmidth has received an order worth approximately INR 1900 million (approximately DKK 200 million) from a leading Indian steel producer, Tata Steel, to supply two pipe conveyors for transport of 6 million t/y of iron ore over a distance of around 9 km from the steel company's Khondbond mines to the railway loading point at Joda in the state of Odisha, located on the east coast of India. The scope of supply includes two pipe conveyors with a total conveying capacity of 1,400 t/h. The pipe conveyors are 3,600 and 5,300 m long, respectively, and will run through a challenging terrain and forest land.

 
Over the past years, Tata Steel has increased its focus on safety and corporate social responsibility with special attention to environmentally friendly initiatives, and the company therefore chose FLSmidth's globally proven pipe conveyor technology for this application. FLSmidth has previously delivered an in-plant pipe conveyor to Tata Steel's Pellet plant application at their Jamshedpur facility, confirming the advantages of the technology.

 
www.flsmidth.com

Related articles:

Coal handling project in India

FLSmidth has been awarded a contract worth approximately 36 million € by Korba West Power Corporation Limited for supply and installation of a 1 800 t/h coal handling plant for their upcoming 2 x 600...

more
Issue 12/2022

FLSmidth to supply overland conveyor system

FLSmidth has been chosen to supply an overland conveyor (OLC) for a large, established copper-gold mine in Southeast Asia, which follows a large equipment order from the same customer earlier in 2022....

more

Multideck SIZERs for TATA steel mill, India

The company STC-Screening Technology Consulting located at Appen near Hamburg received an order from the plant construction firm Outotec GmbH covering two Multideck SIZERs of heavy design for...

more
Issue 09/2011

FLSmidth wins order for a coal handling ­project in India

FLSmidth has been awarded a contract worth approximately 25m € by Jhabua Power Ltd. for the supply and installation of the first phase of a 1800 tons per hour coal handling plant for their upcoming...

more

27.02.2013 / FLSmidth wins large coal project

FLSmidth has won a contract worth approximately 112 million US$ from Vale, its long-term Brazilian customer, to supply Material Handling and Mineral Processing equipment for Vale's Moatize coal mine...

more