Metso’s HRC technology confirmed in pilot testing in Chile

The scalability of Metso’s HRCTM high-pressure grinding technology has successfully been proven in pilot tests. The tests were conducted at a customer pilot plant in Chile during 2016 and 2017. The pilot confirmed that the HRC 800 high-pressure grinding roll fulfills the expected capacity requirements for the application, and that the scale factor defined by Metso in the laboratory environment proved to be correct, independent of the ore type. Based on the results, Metso’s modeling and simulation was proven, and the necessary equipment for the customer’s plant expansion was specified.

HRC technology is a higher-performance alternative to conventional high-pressure grinding rolls. Based on the pilot tests, it enables savings on operational expenses of 10 to 20 %, depending on the ore type. The pilot plant where the technology was tested processed copper and gold at a capacity of 50 t/h, allowing Metso to verify the required equipment for the customer’s future needs. The next pilot with HRC technology will take place in November 2017 in Chile.

www.metso.com

x

Related articles:

Metso Outotec upgrades its service centers in Chile and Peru

Metso is expanding its service centers in Antofagasta, Chile, and Arequipa/Peru, to meet mining customers’ growing needs for servicing large and heavy equipment. The service centers in Chile and Peru...

more
Issue 07-08/2020

Metso to deliver pressure filters to Chile

S?alares Norte, a Chilean greenfield project of the South-African Gold Fields company, has ordered 3 Metso Vertical Plate Pressure Filters with all the ancillary equipment for dry tailings...

more

Metso Outotec wins major order

Metso Outotec has signed a contract for the delivery of key minerals processing technology to a new high-capacity copper concentrator in Russia. The customer and the contract value are not disclosed....

more

Metso launched Nordwheeler portable crusher for manufactured sand production

In response to the growing demand for sustainability, process flexibility and higher capacity, Metso’s Nordwheeler™ NW Rapid™ range expands with the new NW8HRC that is the first portable HRC 8™...

more
Issue 07-08/2014

Metso wins a services contract in Chile

Metso’s services solutions will improve the operational reliability and process efficiency of Codelco’s grinding process. Metso has signed an 18-month services contract with Codelco’s Chuquicamata...

more