Metso to supply Tampa Electric Company

Metso will supply two identical bucket wheel stacker reclaimers (Fig.) to Tampa Electric Company’s Big Bend Station, Apollo Beach, Florida/USA. These two new machines will replace existing equipment of Metso that has been in operation for over 40 years. Total order value is approximately 11.9 million €. According to the new contract, Metso will design, furnish, manufacturer, shop test, inspect, package, store and handle the two identical traveling bucket wheel stacker reclaimers prior to arriving on site. All necessary equipment, accessories, controls and components will be provided for complete operation. The first machine (North) is scheduled for commissioning in May of 2013. The second (South) machine is respectively scheduled for commissio­ning in the fourth quarter of 2013. Stacking and reclaiming capacities are designed to handle 4400 t/h on each of the two identical bucket wheel stacker reclaimers. The reclaim capacity can be a variable of 1100 to 4400 t/h depending on the current requirements needed. These machines will be used by Tampa Electric for stacking and reclaiming coal and petcoke.

 

x

Related articles:

Issue 05/2010

Coal handling reclaiming: The mobile hopper solution

The success of Telestack mobile materials handling systems derives from achieving sustainable value for the client; using mobile bulk handling technology to enhance operational efficiency, minimise...

more
Issue 11/2020 Perfect for coal storage

BEUMER Group provides engineering of stockpiles for the coal industry

H?ard coal is temporarily stored in stockpiles and then continuously fed to be processed, as needed. The design of the depositories must ensure constant filling and reliable emptying. The required...

more
Issue 04/2018

Baosteel shows confidence in SCHADE solutions

In October 2017, SCHADE Lagertechnik GmbH won a further order from Baosteel Iron & Steel Company Ltd., Shanghai, this time for an additional supply of 4 Semi-Portal Reclaimers. These machines have a...

more
Issue 04/2015

Commissioning of overburden system with bucket wheel excavator

Tenova TAKRAF has finished the delivery and erection of an overburden system with bucket wheel excavator for the opencast mine of Zhahanaoer in Inner Mongolia/China (Fig. 1). The system, consisting...

more
Issue 04/2012

Mobile

Stockpiling, reclaiming, truck unloading and link conveyors

Changing trends: The alternative to the stacker/reclaimer system Typical operations in either developing a green-field site or upgrading a current stockyard operation would use a stacker/reclaimer...

more